Hi All,
The guys are still doing some grouting on the bridge when I went down about 4:30 and its a little muddy down there. Everything is done as far as installing the concrete except for the last piece of one of the wings. The power company was supposed to come at 3 p.m., but called and told the guys they weren't coming.
This has been a long hard day for DJ, Pat, Stan, Jeff & Bill. Great job done by all and I am sure once everything is in place & the grouting done so they can backfill, they will all be very happy.
If you would like to see a slide show of the River Road Bridge Installation, click on the following link:
http://www.vtgrandpa.com/photos/slideshow.php?set_albumName=rrbridge_061017
I will have captions up later.[/b]