CONSTRUCTION AND SITE (Hard Costs...) Construction Estimate (Base) $13,158,612 10% Contingency $1,315,861 Construction Subtotal $14,474,473 Asbestos abatement* $10,000 FEES A/E Design Fees $1,052,689 Permit Fees DPS Permit (0.008/$1) $115,796 Act 250 Permit $0 Zoning/Local $0 W/W, Stormwater, Erosion Control $10,000 Clerk of the Works* $150,000 LEED Consultant $0 MEP pre-construction field work $5,000 Lead/Asbestos Consultant/Monitoring* $5,000 Construction Testing Services $10,000 HVAC Commissioning $30,000 Legal Services* $5,000 Surveying* $2,500 Soil Borings* $2,500 Professional Fees Subtotal $1,388,485 MISCELLANEOUS COSTS Bid Advertising* $500 Printing/Postage/reimbursables* $10,000 Moving/Storage Expenses* $30,000 Interim Financing* $0 Builders Risk Insurance* $10,000 Allowance for above $50,500 OWNER PURCHASES Furniture* $35,000 Phone System* $0 Equipment (Smartboards, Door access system, AV, Kiln, etc.)* $40,000 Subtotal $75,000 TOTAL PROJECT BUDGET $15,998,458 *Indicates budget items to be finalized/determined by Owner |
New water main $45,000 At new gym $123,500 At historic entrance $20,975 At new auditorium $39,575 Repave library parking lot $121,360 Courtyard/patio $50,000 stormwater treatment $30,000 New gym addition $2,088,288 Auditorium addition New area $2,065,070 Existing stage/gym renovation $162,500 MS Gym infill $891,800 Sprinkling $32,000 Multi-purpose & Media Center $272,140 Existing Library $198,950 Cafeteria $152,720 Restrooms MS $80,000 HS upstairs $80,000 HS downstairs $80,000 Locker Rooms $96,200 Elevator Replacement $109,050 Art $50,800 Music $142,635 HS Science $432,500 Roofing Existing MS gym $60,000 Reinforce MS gym roof $40,000 Existing Art Room roof $56,250 HS Gym Roof $166,800 Reinforce HS gym roof $22,240 Elementary School MP roof $127,500 MS Science/Art $200,640 Convert HS Art to HS Classrooms $45,976 Health/Nurse $211,140 Sprinkler system New service $12,000 1972 (HS Gym) building $200,000 Remainder of MS/HS (inc. basement) $344,000 Other renovations Flooring Wood floor replacement $246,825 Other $162,860 Ceilings $510,000 Cutting and patching $136,000 Misc doors, accessories, etc. $50,000 Replace 1972 water piping, fittings, etc. $108,000 HVAC DDC controls $510,000 Heat piping and equipment $411,000 Electrical LED lighting conversion $699,960 Fire Alarm modifications $10,000 Misc Code violations $10,000 General Conditions $659,500 Mark-up, Insurance, Bonds $792,858 Total: $13,158,612 |