825 Feet of pipe was installed back in August 1965 - Below is the list of materials & labor involved - Interesting when you look at the 40 hours for the back hoe at $8.50 an hour.  Dean Blake got $6 for one hour of buldozing - Eddie Hubbert got $1.50 an hour and Bob Gates got $2.50 an hour.

(http://www.vtgrandpa.com/photos/albums/forum_photos/Pipe_August19650108.sized.jpg)

The original storage tank was installed, according to a deed shown to me by Paul Langelier, after May 13, 1949 when the deed was signed.