Welcome, %1$s. Please login or register.
November 15, 2024, 07:06:40 AM

 
Posts that, in my personal judgement, create too much conflict in the community, may be deleted - If members repost the same topic, they may be banned from future posts - Even though I have disabled the Registration, send me an email at:  vtgrandpa@yahoo.com if you want to register and I will do that for you
Posts: 46173 Topics: 17681 Members: 517
Newest Member: Christy25
*
+  Henry Raymond
|-+  Fairfax News
| |-+  Current News & Events
| | |-+  Route 104 Fairfax – St. Albans Town Repaving Project
« previous next »
: [1]
: Route 104 Fairfax – St. Albans Town Repaving Project  ( 2621 )
Henry
Administrator
Hero Member
*****
: 15235



« : May 06, 2010, 10:41:48 AM »

TO WHOM IT MAY CONCERN      

FROM:   Stephanie Barrett

RE:      Route 104 Fairfax – St. Albans Town Repaving Project

DATE:      5/6/2010

The following is the schedule of the construction to take place on Route 104 for the week starting May 10, 2010.
   
Monday:
Loop detectors to be cut in at the Route 104 & Access Road traffic signal.

Tuesday:
Guardrail work at the intersection of Route 104 & the Access Road

Monday thru Friday: 
Weather permitting, paving on Route 104 from the intersection of Routes 104 & 104A in Fairfax and proceeding north to the intersection of Routes 104 & 105 in St. Albans.

Please note traffic control will be present.  We ask motorists to use extreme caution while traveling through the zone.  The safety of the workers along with the motorists is of the utmost importance.

The Public Relations telephone number for the public to call with any questions or concerns is 802-862-6085.

Henry Raymond
: [1]  
« previous next »
:  

Powered by MySQL Powered by PHP SMF 2.0.18 | SMF © 2021, Simple Machines Valid XHTML 1.0! Valid CSS!